Funding entity Gas Natural
This project is part of a larger collaboration with Gas Natural aimed at developing tools to support the operations in the interconnected Iberian electricity market. We have developed a model that provides information for short-term bidding (to the day-ahead market, typically), both regarding the optimal production of the different units and regarding how to bid this energy into the market. Three mayor blocks have been identified: 1) The residual demand curves analyzer; 2) the production optimization tool; and 3) the bidding optimization algorithm.
COPLA GN
Legal notice | Cookies policy | Privacy policy
Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, Spain - Tel: (+34) 91 542 28 00
We use our own and third-party cookies to improve the functionality of our website and the quality of our service, by analyzing your browsing habits. I accept this site's cookies.
|
|